5.2 KiB
5.2 KiB
Requirements: TCKRTUIYO - Rainfall Station RTU Web Interface
Defined: 2026-03-12 Core Value: Real-time rainfall and environmental sensor monitoring with automatic data transmission to myvscada server
v1 Requirements
Requirements for initial release. Each maps to roadmap phases.
Dashboard
- DASH-01: Display current rainfall readings (Today, Hourly, MAR Acc, Yearly Acc)
- DASH-02: Display solar voltage reading
- DASH-03: Display battery voltage with status indicator (HIGH/NORMAL/LOW)
- DASH-04: Display current date and time (HH:MM:SS DD-MM-YYYY)
- DASH-05: Display station ID
- DASH-06: Display communication status (signal strength, connection status)
- DASH-07: Display software version
- DASH-08: Real-time updates (auto-refresh or Socket.IO)
- DASH-09: Last updated timestamp indicator
User Interface
- UI-01: Touch-optimized interface for 7" 1024x600 display
- UI-02: Large touch targets (minimum 48px)
- UI-03: Main menu navigation
- UI-04: Responsive layout for remote HD access (1920x1080 on port 9090)
- UI-05: Login/logout functionality
Settings
- SETT-01: Station Info display and edit
- SETT-02: Date/Time setting
- SETT-03: Mobile network settings view/edit
- SETT-04: ADC channel configuration (4 channels, types: 4-20mA, 0-10vDC)
- SETT-05: Rainfall sensor settings (ID, thresholds)
- SETT-06: Water level threshold settings
- SETT-07: EVAP settings
- SETT-08: Network settings (IP, subnet, gateway, DNS, MAC)
- SETT-09: Protocol settings (FTP, SCP, SFTP, WebDAV server config)
Calibration
- CAL-01: View live ADC readings (4 channels)
- CAL-02: View current sensor readings with units
- CAL-03: Reset rainfall counters
- CAL-04: Display channel type, ADC value, datum, reading
File Management
- FILE-01: List CSV files in flash memory
- FILE-02: View CSV file contents
- FILE-03: Navigate file list (scroll up/down)
- FILE-04: Delete CSV files
- FILE-05: Generate tidEDA formatted files
Backend
- BACK-01: Flask backend running on Raspberry Pi
- BACK-02: Sensor data API endpoints
- BACK-03: Settings API (read/write)
- BACK-04: File management API
v2 Requirements
Deferred to future release. Tracked but not in current roadmap.
Historical Data
- HIST-01: Historical rainfall graphs (daily, weekly, monthly)
- HIST-02: Historical voltage graphs
- HIST-03: Date range selection for historical view
- HIST-04: Export data to CSV
Alerts & Notifications
- ALERT-01: Configurable rainfall threshold alerts (Warning, Danger)
- ALERT-02: Configurable water level threshold alerts
- ALERT-03: Visual indicators for alert states
- ALERT-04: SMS notification on threshold breach
Advanced Network
- NETW-01: Automatic retry on transmission failure
- NETW-02: Transmission queue status display
- NETW-03: Manual trigger for immediate transmission
- NETW-04: Transmission log/history
GPS Integration
- GPS-01: Display GPS coordinates
- GPS-02: Manual coordinate entry (backup to USB GPS)
Out of Scope
Explicitly excluded. Documented to prevent scope creep.
| Feature | Reason |
|---|---|
| Third-party cloud integration | Direct server connection only per requirements |
| Mobile native apps | Web-first approach |
| Multi-station dashboards | Server handles aggregation |
| Real-time chat | Outside domain |
| OAuth authentication | Simple session-based auth sufficient for local device |
Traceability
Which phases cover which requirements. Updated during roadmap creation.
| Requirement | Phase | Status |
|---|---|---|
| DASH-01 | Phase 1 | Complete |
| DASH-02 | Phase 1 | Complete |
| DASH-03 | Phase 1 | Complete |
| DASH-04 | Phase 1 | Complete |
| DASH-05 | Phase 1 | Complete |
| DASH-06 | Phase 1 | Complete |
| DASH-07 | Phase 1 | Complete |
| DASH-08 | Phase 1 | Complete |
| DASH-09 | Phase 1 | Complete |
| UI-01 | Phase 1 | Complete |
| UI-02 | Phase 1 | Complete |
| UI-03 | Phase 1 | Complete |
| UI-04 | Phase 4 | Pending |
| UI-05 | Phase 4 | Pending |
| SETT-01 | Phase 1 | Complete |
| SETT-02 | Phase 1 | Complete |
| SETT-03 | Phase 1 | Complete |
| SETT-04 | Phase 1 | Complete |
| SETT-05 | Phase 1 | Complete |
| SETT-06 | Phase 1 | Complete |
| SETT-07 | Phase 1 | Complete |
| SETT-08 | Phase 1 | Complete |
| SETT-09 | Phase 3 | Pending |
| CAL-01 | Phase 1 | Complete |
| CAL-02 | Phase 1 | Complete |
| CAL-03 | Phase 1 | Complete |
| CAL-04 | Phase 1 | Complete |
| FILE-01 | Phase 2 | Pending |
| FILE-02 | Phase 2 | Pending |
| FILE-03 | Phase 2 | Pending |
| FILE-04 | Phase 2 | Pending |
| FILE-05 | Phase 2 | Pending |
| BACK-01 | Phase 1 | Complete |
| BACK-02 | Phase 1 | Complete |
| BACK-03 | Phase 1 | Complete |
| BACK-04 | Phase 2 | Pending |
Coverage:
- v1 requirements: 41 total
- Mapped to phases: 41
- Unmapped: 0 ✓
Requirements defined: 2026-03-12 Last updated: 2026-03-12 after initial definition